PROJECT DESCRIPTION

At Pleasant Mountain Ski Area in Bridgton, ME, Fall Line Construction provided excavation, grading, and snowmaking infrastructure improvements to support trail upgrades and lift expansion. The project required trenching for HDPE snowmaking pipe, drilling and blasting ledge, and stabilizing steep slopes to create safe and durable foundations. Our team coordinated heavy excavation, pipe handling, and concrete foundation support — including aerial placement of components and concrete by helicopter — to deliver the work safely and on schedule.

Equipment Used

  • Hitachi ZX350 Excavator – heavy excavation, trenching, and rock removal
  • John Deere 245G LC Excavator – slope excavation, trenching, and grading
  • John Deere 210G Excavator – finish grading and utility trenching
  • John Deere 748H Grapple Skidder with chains – pipe handling and material transport on steep terrain
  • CAT 730C Articulated Dump Truck – hauling blasted rock and spoil
  • Rock drilling and blasting rigs – ledge removal and trench preparation
  • Concrete forms, pumps, and placement equipment – tower foundation construction
  • Helicopter lift support – aerial transport and placement of towers, lift components, and concrete

Services Provided

  • Ski resort excavation and slope grading
  • Ski lift foundation and infrastructure excavation
  • Access road and work road reconstruction
  • Rock drilling, blasting, and ledge removal
  • Concrete foundation prep and placement
  • Lift component and material transport through snow covered terrain
  • Backfill, compaction, and slope stabilization
  • Site restoration and erosion control